Our Homes / Aaghaz

Aaghazآغاز

275 Ali Block, Al Kabir Town, Raiwind Road, Lahore

“Aaghaz” means beginning. It is our first house.

Being built Latest update: 29 November 2026
Plot
3 marla
Floors
Ground, first, and a room on the roof
Bedrooms
To be confirmed
Bathrooms
To be confirmed
Covered area
To be confirmed
Ready by
To be confirmed
Price
On request

The story so far

From the empty plot to the keys, in order. The latest update is at the stage marked “We are here”.

Stage 1

Plot

We check the plot’s papers, then buy it.

Photos and notes for this stage are being added.

Stage 2

Design

The architect plans every room so a 3 marla house feels roomy.

Photos and notes for this stage are being added.

Stage 3

Foundation

Digging, footings and the base the whole house stands on.

Photos and notes for this stage are being added.

Stage 4

Structure

Brick walls, columns, steel and concrete slabs: the grey structure.

The first floor slab (first lintel)

The ground floor walls were up, so we laid the steel for the first slab and poured the concrete. We photographed the steel before the concrete covered it, because once it is poured nobody can see it again.

The steel
The mesh
The pour
Ground floor brick walls before the slab
Ground floor brick walls before the slab
Wooden shuttering under the slab
Wooden shuttering under the slab
The concrete mixer on site (face blurred)
The concrete mixer on site (face blurred)
Slab steel beside the brick wall, before the pour
Slab steel beside the brick wall, before the pour
Steel mesh across the whole slab
Steel mesh across the whole slab
The slab steel from above, with the team at work
The slab steel from above, with the team at work
The pour seen from across the street
The pour seen from across the street
Levelling the fresh concrete
Levelling the fresh concrete

Stage 5

Services

Wiring, pipes and drains go in, and get tested before they are covered.

The work in this stage

  1. Electrical conduits and switch boxes in the walls and slabsDone
  2. Water supply pipes, hot and coldDone
  3. Drainage and sewerage linesDone
  4. Leak test before the walls are closedDone

Photos and notes for this stage are being added.

Stage 6 · In progress

Finishing

Plaster, floors, doors, kitchen, baths, paint and the front of the house.

The work in this stage

  1. Plaster, inside and outsideDone
  2. Floor base levelled for tilesDone
  3. Floor and wall tiles: rooms, kitchen and bathroomsDone
  4. Woodwork: door frames, doors, wardrobes and kitchen cabinetsIn progress
  5. Roof waterproofing and heat insulationDone

Photos and notes for this stage are being added.

Stage 7

Papers

Transfer papers and every paid utility bill, put together in one file.

The work in this stage

Coming next.

Stage 8

Keys

A family walks through, checks everything, and moves in.

The work in this stage

Coming next.

What it is built with

Steel
Mughal Steel, Grade 60
Cement
Maple Leaf and DG Cement
Bricks
Awal

Invoices for each will be shown here.

Floor plans

The architect’s plans will be added here, floor by floor, with room sizes.

Papers

  • Transfer papers, from our purchase to the transfer into your name
  • Electricity and other utility bills for the whole time we owned the house

Other papers, such as society approvals and the approved map, will be listed here with their status once confirmed.

Where it is

275 Ali Block, Al Kabir Town, Raiwind Road, Lahore

Open in Google Maps

Ask about Aaghaz

Leave your details and we will get back to you. Only the first three are needed.

Interested in *
More about you (optional)

Ask us

Leave your details and we will get back to you. Only the first three are needed.

Interested in *
More about you (optional)